
Boring Program:
* Weeks ending 4/2/10 and 4/9/10 - Borings within the MBTA right-of-way from the Lechmere Station to the Red Bridge in Cambridge
Boring typically occurs between 7:00 AM and 3:30 PM on weekdays.
Field Survey:
Weeks ending 4/2/10 and 4/9/10:
* Intersection of O'Brien Highway and Cambridge Street in Cambridge
* Intersection of Third Street and O'Brien Highway in Cambridge
* Utility survey within the MBTA right-of-way in Cambridge
* Finalize intersection survey along O'Brien Highway in Cambridge
* Community Path - beginning in the Inner Belt area of Somerville
No comments:
Post a Comment