Search This Blog

Archive

Tuesday, May 4, 2010

Greenline Extension Field Work Update...



Boring Program: Weeks ending 5/7/10 and 5/14/10:

->Within the MBTA right-of-way from Red Bridge in Cambridge to Washington Street in Somerville
->Within the MBTA Fitchburg Commuter Rail right-of-way from Red Bridge in Cambridge to Prospect Street in Somerville
->Cedar Street in Somerville between Murdock St. and Franny Rd.
->Medford Street in Somerville between Walnut St. and Pearl St.
->Boring typically occurs between 7:00 AM and 3:30 PM on weekdays.

Field Survey: Weeks ending 5/7/10 and 5/14/10:

->Intersections along O'Brien Highway and Cambridge Street between East Street and Third Avenue in Cambridge
->Abutting property research and survey along the Lowell Commuter Rail Line in Somerville

No comments: