Search This Blog

Archive

Tuesday, May 25, 2010

Greenline Field Work Continues...


Boring Program:

Weeks ending 5/28/10 and 6/4/10:
Within the MBTA Fitchburg Commuter Rail right-of-way from Medford Street to Prospect Street in Somerville
Within the MBTA Lowell Commuter Rail right-of-way from Washington Street to Cross Street in Somerville
At College Avenue near the MBTA right-of-way in Medford
On NSTAR property near Medford Street in Somerville
On Tufts property along the MBTA right-of-way in Medford
Boring typically occurs between 7:00 AM and 3:30 PM on weekdays.

Field Survey:

Weeks ending 5/28/10 and 6/4/10:
Intersections along O'Brien Highway from Cambridge Street to Third Street in Cambridge
Abutting property research and survey along the Lowell Commuter Rail Line in Somerville

Please do not be concerned if you see people performing the work described here; they are authorized to be in and around the MBTA right-of-way.

No comments: