September 28 - Argenziano School (Cafetorium), 290 Washington Street, Somerville
September 29 - Medford City Hall (Council Chambers), 85 George P. Hassett Drive, Medford
Each meeting will begin at 5:30 pm with an "Introduction to the Green Line" presentation. New material will be presented starting at 6:15 pm.
Field Survey: Week ending 10/1/10
Survey of drainage system inverts* within the Lowell Line Commuter Rail corridor (postponed from a previous date)
*Inverts are elevations of the interior bottom of the existing drain pipes measured at a drainage structure.
Boring Program: Weeks ending 9/24/10 and 10/1/10:
Borings within the MBTA Lowell Commuter Rail right-of-way at Medford Street in Somerville
Borings between the MBTA Fitchburg Commuter Rail right-of-way and the Boston Engine Terminal in Somerville
Borings within the MBTA Lowell Commuter Rail right-of-way from Harvard Street in Medford to Cross Street in Somerville
Boring typically occurs between 7:00 AM and 3:30 PM on weekdays.