Field Survey: Weeks ending 9/10/10 and 9/17/10:
* Survey of drainage system inverts* within the Lowell Line Commuter Rail corridor
*Inverts are elevations of the interior bottom of the existing drain pipes measured at a drainage structure.
Boring Program: Weeks ending 9/10/10 and 9/17/10:
* Borings within the MBTA Lowell Commuter Rail Line right-of-way from Brookings Street in Medford to Broadway in Medford
* Borings within the MBTA Lowell Commuter Rail Line right-of-way from Brookings Street in Medford to Lowell Street in Somerville
Boring typically occurs between 7:00 AM and 3:30 PM on weekdays.
No comments:
Post a Comment