Search This Blog

Archive

Wednesday, October 13, 2010

Green Line Extension Meeting Summaries Are Published and Field Testing Continues



A summary from the September public meeting has been published!

Field Survey: Weeks ending 10/15/10 and 10/22/10:
  • Bridge survey within the Lowell Commuter Rail corridor at Cedar Street in Somerville
  • Field edit* of proposed maintenance facility plans in Somerville
  • Field locate** railroad right-of-way in Somerville
* The survey manager will verify in the field that all features have been accurately located on the base plan.
** Mark or identify features on site based on a record plan.

Boring Program: Weeks ending 10/15/10 and 10/22/10:
  • Borings within the MBTA Fitchburg Commuter Rail right-of-way between McGrath Highway and the Boston Engine Terminal in Somerville
  • Borings within the MBTA Lowell Commuter Rail right-of-way between Cedar Street and Washington Street in Somerville
  • Borings within the MBTA Lowell Commuter Rail right-of-way between Harvard Street in Medford and Broadway in Somerville
  • Maintenance facility borings off Third Avenue in the Inner Belt area of Somerville
Boring typically occurs between 7:00 AM and 3:30 PM on weekdays.

No comments: