Search This Blog

Archive

Monday, March 8, 2010

Green Line Extension Project Field Work (Update for week of 3/12/10)


Boring Program:

Weeks ending 3/12/10 and 3/19/10 - Borings within the MBTA right-of-way from Lechmere Station in Cambridge to the area of the MBTA Red Bridge in Somerville
Boring typically occurs between 7:00 AM and 3:30 PM on weekdays.

Field Survey:Week ending 3/12/10:

Intersection of Washington Street and McGrath Highway in Somerville
Cedar Street Bridge in Somerville
Week ending 3/19/10:

Intersection of Washington Street and Tufts Street in Somerville
College Avenue Bridge in Medford
Brookings Street to North Street in Medford within the MBTA right-of-way

No comments: